Proven Track Record

Operational Transformations.

Detailed breakdowns of how we redefined efficiency, inventory turns, and profitability for manufacturing, logistics, and trading powerhouses.

Results: Showing 17 case studies
Module: Manufacturing (MRP) × Clear all
Case Study: 35% Less QC Rejection for Forging Unit
Jul 21, 2026
odoo quality control forging case study
9 min read

Case Study: 35% Less QC Rejection for Forging Unit

The Challenge: High Rejection with No Way to Find the Cause This forging unit had been operating for 18 years and supplied automotive Tier-1 and Tier-2 customers across Gujarat and Maharashtra. Their engineering quality was solid — their production team knew their craft. But their rejection rate had crept up over the previous two years, and nobody could pinpoint why. The fundamental problem was a data problem. When a batch of components failed inspection — either internally at final QC or at the customer's incoming inspection — there was no systematic way to trace back what had gone wrong. The paper job cards from the relevant production run might or might not be retrievable. The heat records from the furnace were in a separate logbook. The die condition at the time of forging was undocumented.

SR
Case #117
Analyze
Case Study: 35% Less QC Rejection for Forging Unit
Jul 10, 2026
odoo quality control forging case study
9 min read

Case Study: 35% Less QC Rejection for Forging Unit

The Challenge: High Rejection with No Way to Find the Cause This forging unit had been operating for 18 years and supplied automotive Tier-1 and Tier-2 customers across Gujarat and Maharashtra. Their engineering quality was solid — their production team knew their craft. But their rejection rate had crept up over the previous two years, and nobody could pinpoint why. The fundamental problem was a data problem. When a batch of components failed inspection — either internally at final QC or at the customer's incoming inspection — there was no systematic way to trace back what had gone wrong. The paper job cards from the relevant production run might or might not be retrievable. The heat records from the furnace were in a separate logbook. The die condition at the time of forging was undocumented.

SR
Case #116
Analyze
Case Study: 40% Less Downtime for Bearing Manufacturer
Jun 20, 2026
odoo mrp case study bearing manufacturer
8 min read

Case Study: 40% Less Downtime for Bearing Manufacturer

At a Glance Industry Bearing Manufacturing Company Size ~120 employees, 3 production lines Location Pune, Maharashtra Challenge Unplanned machine downtime causing missed deliveries and high rework costs Result 40% reduction in unplanned downtime within 6 months of Odoo MRP implementation Background This bearing manufacturer had been in business for over two decades, supplying precision bearings to automotive OEMs and industrial equipment companies across India. With three production lines and around 120 employees, the company had grown steadily — but its systems had not kept up. Production planning was done in Excel. Maintenance schedules were tracked by the maintenance team in a separate register. When a machine broke down, the production team found out only when output stopped. There was no early warning, no visibility into upcoming maintenance requirements, and no connection between machine health data and production scheduling. The result was a pattern of unplanned stoppages that had become accepted as normal. Two to three machine breakdowns per month, each causing anywhere from four to twelve hours of lost production. Delivery timelines slipped. Customers raised complaints. And the management team spent considerable time firefighting instead of planning.

SR
Case #113
Analyze
Casting Manufacturer Streamlines Production Planning with Odoo MRP
May 28, 2026
casting manufacturer odoo mrp case study
9 min read

Casting Manufacturer Streamlines Production Planning with Odoo MRP

Case Study: Casting Manufacturer Streamlines Production Planning with Odoo MRP Client Background Our client is a mid-sized grey iron casting manufacturer based in Maharashtra, producing components for the automotive, agriculture, and industrial machinery sectors. With a workforce of around 120 people and two production lines running six days a week, they were handling a mix of make-to-order and make-to-stock production across 80+ SKUs. The business had been operating for over 15 years and had a strong customer base — but growth was creating strain. What worked at ₹5 crore annual revenue was breaking down at ₹20 crore. The team was working harder, but the results weren't reflecting that effort.

SR
Case #110
Analyze
Odoo Job Card Automation for Forging Unit
May 21, 2026
forging unit odoo case study
9 min read

Odoo Job Card Automation for Forging Unit

Forging Unit Eliminates Manual Job Cards with Custom Odoo Workflow At a Glance Industry: Open and Closed Die Forging (Automotive and Bearing components) Plant Size: Two production lines, ~85 employees, 1,200 MT/year capacity Location: Pune, Maharashtra Project: Custom Odoo workflow for job card management and shop-floor tracking Timeline: 11 weeks from kickoff to go-live Outcome: 100% paper job cards eliminated, on-time delivery up from 78% to 96%, rejection cost reduced by 31% This forging unit odoo case study covers a project we delivered in late 2025. The client is a Pune-based forging house supplying automotive crankshafts, connecting rods, and bearing rings to OEM tier-1 suppliers. They came to Sunray Datalinks with a familiar story. Production was running well in volume, but the office had no real visibility into the shop floor. Job cards were printed every morning, lost by afternoon, and reconstructed from memory at month-end. Customer schedules were slipping, and the rejection register lived in a steel cupboard.

SR
Case #109
Analyze
Odoo for Cosmetic Quality Control
Apr 23, 2026
odoo quality control cosmetic manufacturer
9 min read

Odoo for Cosmetic Quality Control

Case Study: How a Cosmetic Manufacturer Hit Zero Batch Rejections With Odoo Quality Control Odoo quality control for cosmetic manufacturers sounds like a niche use case until you have spent a morning inside a plant watching three batches of foundation fail final inspection and get sent back for rework. This case study walks through exactly how Sunray Datalinks helped a mid-sized cosmetic manufacturer go from 6.4 percent batch rejection rates to zero — in nine months — using Odoo's quality control module and a few industry-specific customisations. Names and numbers are shared with permission, with the brand anonymised.

SR
Case #106
Analyze
AI-Driven ERP for Plywood Manufacturer
Apr 15, 2026
Case Study
3 min read

AI-Driven ERP for Plywood Manufacturer

Case Study: Plywood Manufacturer Reduces Production Wastage by 22% with AI-Driven ERP 📌 EXECUTIVE SUMMARY Client: Mid-size plywood manufacturing unit, Gujarat, India Production capacity: 12,000 sq. metres per day Challenge: High production wastage, no real-time visibility, manual tracking Solution: Custom AI-integrated ERP built on Odoo by Sunray Datalinks Timeline: 10 weeks from project start to go-live Key result: 22% reduction in production wastage; month-end close reduced from 7 days to 2 days

SR
Case #105
Analyze
Custom ERP for Road Transport Firm
Mar 30, 2026
road transport erp case study
9 min read

Custom ERP for Road Transport Firm

Background This transport company had been operating for over 12 years, serving manufacturing clients across Gujarat and Maharashtra. With a fleet of 62 vehicles and operations running round the clock, managing the business had become genuinely difficult. The owner was spending 3–4 hours every day chasing information — which trucks were on which routes, which invoices were pending, which drivers had outstanding advances. His operations manager had a similar problem. And the finance team was reconciling everything manually at the end of each month, a process that took 4–5 days and was still error-prone.

SR
Case #103
Analyze
Proven Results

Achieve similar efficiency & ROI in your enterprise.

Discuss your operational bottlenecks with our certified Odoo consultants and get a step-by-step digital roadmap.

Live Support

Need help? Inquire Now