AI-Driven ERP for Plywood Manufacturer
Case Study: Plywood Manufacturer Reduces Production Wastage by 22% with AI-Driven ERP 📌 EXECUTIVE SUMMARY Client: Mid-size plywood manufacturing unit, Gujarat, India Production capacity: 12,000 sq. metres per day Challenge: High production wastage, no real-time visibility, manual tracking Solution: Custom AI-integrated ERP built on Odoo by Sunray Datalinks Timeline: 10 weeks from project start to go-live Key result: 22% reduction in production wastage; month-end close reduced from 7 days to 2 days